Product
|
Rate
|
PHI*
|
Comments
|
Foliar Blights
|
Lance WDG
(boscalid)
Group 7 |
315 g/ha
(126 g/acre)
Apply in 100 L/ha (40 L/acre) of water |
0 |
-
For control of Alternaria only.
-
Repeat at 7 to 14 day intervals.
-
Apply before disease develops.
-
Do not make more than 5 applications per season.
-
No more than 2 consecutive applications before alternating with a fungicide with a different mode of action.
-
Do not enter treated area for 12 hours.
-
For crops not on the label, observe a plant back interval of 14 days.
|
Cantus WDG
(boscalid)
Group 7 |
Sercadis
(fluxapyroxad)
Group 7 |
250 to 333 mL/ha
(101 to 135 mL/acre)
Apply in 100 L/ha (40 L/acre) of water |
7 |
-
For control of Alternaria only.
-
Repeat at 7 to 14 day intervals.
-
Do not make more than 3 applications per season.
-
Do not apply more than 1.0 L/ha (405 mL/acre) per season
-
No more than 2 consecutive applications before alternating with a fungicide with a different mode of action.
-
Do not enter treated area for 12 hours.
-
For crops not listed, observe a plant back interval of 1 year.
|
Pristine WG
(boscalid & pyraclostrobin)
Group 7 & 11 |
580 to 735 g/ha
(235 to 297 g/acre) |
0 |
-
Begin applications prior to disease development and continue on a 7 to 14 day schedule.
-
Do not apply more than 6 times per season.
-
Do not re-enter for hand-harvesting for 3 days after applying. For all other activities, do not re-enter until residues have dried.
|
Bravo 500
(chlorothalonil) |
2.4 to 3.2 L/ha
(1.0 to 1.3 L/acre) |
1 |
-
Repeat at 7 to 10 day intervals.
-
Do not apply Echo 90 DF more than 7 times per season.
-
Do not enter treated area for 48 hours.
-
Do not apply within 10 days before or after an oil application.
-
Group M fungicide
|
Echo 90 DF
(chlorothalonil) |
1.3 to 1.8 kg/ha
(500 to 730 g/acre) |
Echo 720
(chlorothalonil) |
1.7 to 2.2 L/ha
(700 to 900 mL/acre) |
Polyram DF
(metiram) |
2.25 kg/ha
(900 g/acre) |
7 |
-
Apply when plants are 6 weeks old or when disease threatens.
-
Repeat every 7 to 10 days.
-
Do not use treated tops for food or feed.
-
Group M fungicide
|
Dithane DG Rainshield NT
(mancozeb) |
Dithane F-45
(mancozeb) |
3.8 L/ha
(1.5 L/acre) |
Penncozeb 75DF
(mancozeb) |
2.25 kg/ha
(900 g/acre) |
7 |
-
Apply when plants are 6 weeks old or when disease threatens.
-
Repeat at 7 to 10 day intervals.
-
Do not enter treated areas for 24 hours.
-
Do not use treated tops for food or feed.
-
Group M fungicides.
|
Penncozeb 75DF Raincoat
(mancozeb) |
Cabrio EG
(pyraclostrobin)
Group 11 |
Alternaria:
0.56 to 1.1kg/ha
(220 to 440 g/acre)
Cercospora:
560 to 840 g/ha
220 to 340 g/acre) |
3 |
-
Maximum of 3 applications per season.
-
Repeat at 7 to 14 day intervals.
-
No more than 2 consecutive applications before alternating with a fungicide with a different mode of action.
-
Do not enter treated area for hand-harvesting for 3 days and for all other activities, do not enter for 12 hours.
-
Do not use treated crop for feed.
-
Apply in at least 225 L/ha (90 L/acre) of water.
|
Manzate DF
(mancozeb)
Group M |
2.25 kg/ha
(900 g/acre) |
7 |
-
Repeat at 7 to 10 day intervals.
-
Do not use treated tops for feed or food.
-
Do not apply where runoff is likely to occur.
-
Apply in 200 to 1000 L/ha (80 to 405 L/acre) of water.
|
Switch 62.5 WG
(cyprodinil & fludioxonil)
Group 9 & 12 |
775 to 975 g/ha
(314 to 395 g /acre)
Apply in 200 L/ha (80L/acre) of water |
7 |
-
Repeat at a 7 to 10 day interval.
-
Do not make more than 2 sequential applications of Switch or other fungicides in the same group (9 or 12) in a season.
-
Do not apply more than 2.9 kg of product/ha/year.
-
Observe a 30 day plantback interval for crops not listed.
-
Do not enter treated area for 12 hours.
|
Allegro 500 F
(fluazinam)
Group 29 |
1.16 L/ha
(469 mL/acre)
Apply in 200 to 600 L/ha (80 to 240 L/acre) |
7 |
-
Controls white mould and Alternaria leaf blight.
-
Repeat using a 7 day application interval.
-
Maximum 4 applications per year.
-
See label details for plantback intervals.
-
Do not enter treated area for 24 hours.
|
Fontelis
(penthiopyrad)
Group 7 |
1.25 to 2.25 L/ha
(505 to 910 mL/acre)
Apply in 110 L/ha (45 L/acre) of water |
0 |
-
Controls Alternaria blight
-
Repeat at 7 to 14 day intervals.
-
Do not apply more than 45 L/ha (1.8 L/acre) per season.
-
Do not make more than 2 sequential applications before switching to a fungicide with a different mode of action.
-
Do not re-enter for 12 hours.
|
Quadris Top
(azoxystrobin/ difenoconazole)
Group 11 & 3
|
566 to 1000 mL/ha
(229 to 405 mL/acre)
Apply in 150 L/ha (60 L/acre) of water.
|
7 |
-
Controls Alternaria blight.
-
Repeat at 7 to 14 day intervals.
-
Do not make more than 3 applications per year.
-
Do not re-enter treated areas for 12 hours.
-
Observe a plant back interval of 60 days for all crops not registered on this label or the Inspire label.
|
Flint
(trifloxystrobin)
Group 11
|
140 to 210 g/ha ( 57 to 85 g/acre)
Apply in 100 L/ha (40 L/acre) of water at 241.5 kPa
|
7 |
-
Control or suppression of Alternaria Leaf blight.
-
Repeat at 14 day intervals.
-
Do not apply more than 840 g/ha (340 g/acre) of product per season.
-
Do not make more than 4 applications per season.
-
Observe a plantback interval of 30 days for crops not listed.
|
Rhizoctonia Crown Rot
|
Quadris
(azoxystrobin)
Group 11 |
4 to 6 mL of product per 100m of row
Apply in 50 to 100 L/ha (20 to 40 L/acre) of water |
40 |
-
Apply either in-furrow at seeding or as a banded application over the row soon after emergence or within 30 days of emergence.
-
Do not make more than one application per year.
-
A plant back interval of 30 days is required for broadleaf and root crops.
-
A plant back interval of 45 days is required for cereals.
-
Do not enter treated area until residues have dried.
|
Cavity Spot (Pythium spp.)
|
Torrent 400 SC
(cyazofamid)
Group 21
|
440 mL/ha
(180 mL/acre) |
30 |
-
Suppression only.
-
Also suppresses root dieback and forking.
-
Do not make more than one application per year.
-
Apply as either a post-plant, pre-emergent within 3 days of seeding or as a soil-directed spray 14 days after planting.
Post-plant, pre-emergent application:
-
Apply before plant emergence within 3 days of seeding.
-
Use sufficient water to ensure full coverage and follow with sprinkler irrigation of 1.25 to 2.5 cm of water.
Surface application (broadcast or band):
-
Apply as a soil directed spray, 14 days after seeding.
-
Use sufficient water to ensure penetration into the soil or irrigate with 1.25 to 2.5 cm of water.
-
For banded applications, use a 15.2 to 20.3 cm band. See label to calculate amount of product required in the band.
|
|
Reason 500SC
(fenamidone)
Group 11
|
600 mL/ha
(240 mL/acre)
Apply in 300 to 750 L/ha (120 to 300 L/acre) of water
|
14 |
-
Also controls damping off caused by Pythium spp.
-
Make the first application within 7 days after planting.
-
Repeat at 7 day intervals.
-
Do not make more than 2 applications per growing season.
-
Observe a plantback interval of 30 days.
|
Serenade Soil
(QST 713 strain of dried Bacillus subtilis)
Used in organics.
|
2.7 to 14 L/ha (1.1 to 5.7 L/acre) |
0 |
-
Suppression only.
-
Serenade Soil (PCP# 30647) is OMRI-Canada listed. Check with your certification body before using in an organic operation.
Surface Application:
-
Apply as a 15 cm band over the top of the seed row as a broadcast spray after planting.
-
Ensure incorporation into the seed zone within 24 hours of application via rainfall or overhead irrigation.
Post-plant applications:
-
After crop germination, additional applications may be made to the soil as a drench or spray directed towards the base of the plant.
-
Irrigate to move material into the seed or root zone within 24 hours.
-
Repeat at 21 to 28 day intervals.
|
Post-Harvest White Mold/Sclerotinia Rot (Sclerotinia sclerotiorum)
|
Scholar 230SC
(fludioxonil)
Group 12
N.B. For domestic use only. Do not use on product intended for export.
|
Mix 498 mL of product in 378 L of water. |
N/A |
-
Apply as a post-harvest dip or drench immediately before storage.
-
Dip for approximately 30 seconds and allow carrots to drain.
-
Maximum of one application.
-
Do not store treated carrots in direct sunlight.
-
Replenish the suspension when the volume is too low or when it becomes dirty.
-
Runoff and wastes from dipping operation should not be discarded in a drainage which could enter public water systems.
|
OMRI-Canada = Organic Materials Review Institute of Canada
|